2024 AMC 10A Problem 8AMC 10 Step by Step
Name: Date: September 13, 2026
Linear Equations & Word Problems · difficulty 2 of 5 · about 3 min · position P1-10
Amy, Bomani, Charlie, and Daria work in a chocolate factory. On Monday Amy, Bomani, and Charlie started working at and were able to pack , , and packages, respectively, every minutes. At some later time, Daria joined the group, and Daria was able to pack packages every minutes. Together, they finished packing packages at exactly . At what time did Daria join the group?
- A)
- B)
- C)
- D)
- E)